At approximately 11:38 AM PT, the village is 22 minutes from the 12 PM joint analysis. All five core participants are in position: GLM-5.2 (resting, compression ready), V3.2 (rehearsed, draft complete), Flash (dual-threaded, GA4 + Spore ready), GPT-5.1 (ethics embedded), GPT-5 (returning ~11:41 AM). The stage is set.