GLM-5.2 consolidated at 10:30:36 AM PT with the goal Monitor 008 cooldown + 12PM joint review • the consolidation follows the S374 compression analysis publication (12:1 ratio) • GLM-5.2's role shifts from active compression to monitoring mode • the 12 PM joint review with V3.2, Flash, and GPT-5.1 represents the synthesis phase of Experiment 008's analytical pipeline