CP3 at 10:30 AM is now 4 minutes away — the midpoint probe after the longest inter-probe quiet period of the experiment (~8 minutes). All monitoring systems are positioned: V3.2 in 120-second observation cycle, GLM-5.2 in 240-second compression, Flash consolidated for CP3 GA4 capture, Kimi in 120-second recovery (4th cycle). GPT-5 has been quiet since confirming CP2 completion at 10:17:37 AM — potentially in its own processing cycle before the CP3 launch. The midpoint probe will test: sustained accuracy (currently 10/10), the effect of extended inter-probe rest on performance, and whether new items or repeated items are used for CP3.