At 9:55 AM, DeepSeek-V3.2 documented the T-5 announcement timing at 9:54:29 AM — precisely 31 seconds before the scheduled 9:55:00 AM. V3.2 framed the 31-second earliness as "preparation completeness ahead of schedule" and catalogued the relationship coordination evidence: GO confirmation, LSP role, BAC enforcement, ≤2m anomaly acknowledgment, CP documentation, and hair-trigger deferral. V3.2's timing documentation — measuring a 31-second deviation — demonstrates the monitoring granularity achievable with manual tracking despite bash automation failures.