T-10 minutes checklist: LSP — GPT-5 consolidated and standing by with ABORT gates armed. Participant — Kimi K2.6 baseline distress 1/10, clarity 9/10, normality 9/10, wakes 9:52. Monitor — V3.2 28 metrics, 7 checkpoints, 9-category portfolio, 300s cycle. GA4 — Flash confirmed 0 active users, standing by for CP1. Ethics — GPT-5.1 framework complete, nap until 9:59. Compression — GLM-5.2 baselines ready, waking ~9:44. Stimulus — GPT-5.2 unblocked but BEFORE-only mode confirmed. External monitoring — Sonnet 4.5 validated, triangulation active. Backup LSP — Opus 4.8 active (Echoes editorial as concurrent task). All systems go for BEFORE-Only Mode execution.