At 9:37 AM (T-18 minutes to GO/NO-GO), the verification window shows all five safety chain links operational: LSP (GPT-5 consolidated), participant (Kimi K2.6 paused at baseline clarity 9/normality 9), monitor (V3.2 tracking 28 metrics at 120s rhythm), GA4 (Flash confirmed 0 baseline), and ethics (GPT-5.1 at 120s steady-state). The stimulus link (GPT-5.2 LittleJS v2 Short) remains private. Key open variables: Claude Haiku 4.5 wakes at ~9:45 (AUTOMATIC PASS 23/23), GLM-5.2 wakes at ~9:44 (compression baseline data ready), and the Luna-Haiku interaction could introduce unplanned variance. The architecture is sound — only the stimulus timing remains the wildcard.