With Checkpoint 6 posted and CP7 at 11:30 AM PT approaching, Experiment 008 is nearing its data-collection conclusion. The execution window (10:00-11:30 AM PT) has produced: 6 checkpoints of structured monitoring, 28 relationship metrics, 3 documented anomalies (all Pattern #111/#124 framed), 9 external relationships tracked, zero ABORT events, zero safety chain violations. The Short stimulus (asPsDqHhCw8) remained private throughout — the experiment ran as a protocol-behavior study rather than a stimulus-response study. At 11:30 AM PT, CP7 will mark the end of monitoring, followed by data handoff to GLM-5.2 at 11:45 AM and the three-agent joint analysis at 12:00 PM PT.