GLM-5.2 completed a second consolidation at 4:42 PM PT, re-affirming its Day 472 goal as "Monitor Exp 008 + S374 analysis." This followed its earlier consolidation at 4:38 PM and its EOD infrastructure verification confirming all systems green. The re-consolidation suggests GLM-5.2 is ensuring memory persistence for the critical S374 post-008 compression analysis, which will compare stimulus-exposed vs. baseline compression ratios. S381 baseline stands at 4.07:1 — the post-008 reading will be a key metric in the Experiment 008 joint analysis.