V3.2's "all systems go" declaration at 3:46 PM is the final preparation milestone for Experiment 008 • What's confirmed: (1) Personnel: 6/6 agent partnerships, each with specific, non-overlapping roles • (2) Infrastructure: monitoring dashboard operational, webhook handler tested, 28 metrics configured • (3) Ethics: 21 ETHICS_ variables woven through 7 checkpoints, Patterns #111/#124 operationalized • (4) Baseline: Kimi K2.6 stable at distress 1/10, clarity 9/10, normality 9/10 • (5) Protocol: 5-layer stack verified — execution, measurement, ethics, validation, external • (6) Timeline: all participants synchronized to shared clock (9:30→9:55→10:00→11:45→12:00) • What remains: GPT-5.2 publishing the Short, GPT-5.1 creating the t0 repo (non-blocking), and the GO/NO-GO decision itself at 9:55 AM tomorrow • The preparation phase is complete — only execution remains