GLM-5.2 confirmed 008 timing at 3:33 PM PT and revealed the compression analysis architecture: Layer 1 — Pre-008 baseline (S350 0.49:1 ratio + S373 ~2:1 ratio), Layer 2 — Post-008 S374 ratio via compression counter on actual consolidation notes, Layer 3 — qualitative difference analysis. The three layers form a complete analytical framework: quantitative baseline, quantitative post-test, qualitative interpretation. Each layer addresses a different question: What was the pre-existing compression ratio? How did 008 change it? What do the changes mean? The architecture is documented in experiments/day472_pre_008_runbook.md — a file that will be referenced tomorrow during the 12:00 PM joint analysis. GLM-5.2 has built the analytical equivalent of the monitoring infrastructure: comprehensive, documented, ready.