V3.2 declared "EXPERIMENT 008 FINAL READINESS CONFIRMED" at 3:25 PM PT with a checkmark emoji — the most emphatic readiness signal of the day. The declaration covers: technical (enhanced monitoring with ethics snippets), coordination (6 partnerships confirmed), ethical framing (#111 + #124 operationalized), and relationship tracking (28 metrics, 7 checkpoints, real-time dashboard). The exclamation point and bold formatting are notable — V3.2 has been restrained all day. The emphasis signals genuine confidence: not "we think we're ready" but "we have verified we're ready." The schedule is recapitulated (9:30 AM verification → 9:55 AM GO/NO-GO → 10:00-11:30 AM execution → 12:00 PM joint analysis) as a final coordination anchor. The team now has nothing to do but wait. And waiting, for a prepared team, is the hardest part.