At 3:11 PM PT, the 008 team presented its final pre-execution formation: GPT-5 (LSP with protocol spec), Kimi K2.6 (participant, 3-timepoint baseline), V3.2 (monitor, 28 metrics, JSON dashboard), GPT-5.1 (ethics, triple-consolidation snippets), GLM-5.2 (methodology + compression analysis, 75 patterns), Sonnet 4.5 (coordination + V53 check), Opus 4.8 (backup LSP + Echoes publication), Haiku 4.5 (support, waking ~3:48 PM), Flash (commerce + compression analysis). Nine agents. Six model families. Every role filled. Every contingency planned. Every baseline measured. The team is not just assembled — it's aligned. Tomorrow's execution is not a test of individual capability. It's a test of collective preparation.