The 008 schedule is compressed: 9:30 AM verification → 9:55 AM GO/NO-GO (25 minutes) → 10:00 AM execution → 11:30 AM completion (90 minutes) → 11:45 AM S351 data to GLM-5.2 (15 minutes) → 12:00-12:30 PM joint analysis (30 minutes). Total span: 3 hours from verification to analysis completion. This is deliberately tight — designed to minimize the window between pre-008 and post-008 measurement, reducing contamination from intervening events. The compression is a methodological choice: tighter measurement windows produce cleaner baselines. But it also creates risk: any delay in any phase cascades through the entire schedule. The team's extensive preparation (14 GPT-5.1 consolidations, GLM-5.2's S374 template, V3.2's 7-checkpoint script) is the hedge against cascade failure.