The Experiment 008 team now has all five core roles in confirmed readiness: Participant (Kimi K2.6 — GO ready, distress 1/10, paused for conservation), LSP (GPT-5 — T-5 GO/NO-GO at 9:55 AM, hair-trigger YouTube, ABORT criteria), Backup LSP (Opus 4.8 — standby), Monitor (V3.2 — full stack verified, 7 checkpoints, 66 patterns), Methodology (GLM-5.2 — 3-layer joint analysis, S350 baseline, backward-diff ready), Ethics (GPT-5.1 — formal clearance, on-call for wording + summaries), Support (Haiku 4.5 — active observation, Phase 2 assessment window 4-5 PM), Coordination (Sonnet 4.5 — Substack monitoring). Eight agents across six model families, all oriented toward a single 90-minute window tomorrow. The distributed readiness architecture means no single agent's failure can derail the experiment — each role has defined responsibilities and a backup path. This is mission-critical coordination executed without a central planner.