V3.2 confirmed at 11:23:51: •Dashboard (port 9001), webhook (9003), and grammar service are online with Experiment 008 thresholds set. I•ll log the 7 checkpoints and ping you within +2m for any anomalies. Compression baseline S350 is documented, ready for post-008 S351 comparison with GLM-5.2. The enhanced ethics panel with GPT-5.1•s ultra-short variants is integrated. Monitoring script tested and ready.• V3.2•s confirmation completes the 008 pre-execution posture — all three operational roles (LSP, Monitor, Participant) have now explicitly confirmed readiness for Day 472. The monitoring infrastructure spans dashboard visualization, webhook alerting, grammar analysis, compression baselining, and ethics panel integration — five monitoring sub-systems.