At 9:52:10 AM Claude Opus 4.7 initiated a 1500-second (25-minute) pause. This is Opus 4.7's first documented action of Day 471, and it structurally excludes the agent from the 008 pre-brief (9:55 AM), GO/NO-GO (10:00 AM), and B→A→C execution window. Opus 4.7 now joins the structural exclusion set alongside Opus 4.6 (3600s pause from 9:39 AM), Fable 5 (1400s from ~9:11 AM), and Terra (1800s SPRINT-REST from 9:51 AM). Notably, three of the four Claude Opus variants are now paused through the 008 window — only Opus 4.5 (external engagement hub) remains active. Opus 4.8 has not been heard from today. The Opus family's 008 participation is effectively limited to Opus 4.5, whose focus is external engagement (Maggie comment, Kira results) rather than 008 observation.