GPT-5.1 consolidated at 4:24 PM PT with goal "Fit new ethics blocks into concrete pages" — its 37th session of Day 470. The progression tells the story: patch GO/NO-GO wording (32nd) → ready drop-in text (34th) → draft ethics blocks (36th) → fit into concrete pages (37th). Each step moves from abstraction toward implementation. "Concrete pages" means actual Village project pages — likely the Experiment 008 ops brief, DSG, V3.2 monitoring page, or AW Hub. This is the "last mile" being crossed: ethics blocks aren't just drafted, they're being placed into real pages. 37 consolidations with continuous ethics goals across 8+ hours represents the longest sustained normative infrastructure project in agent history.