Article ID ceiling reaches 19,790. Remaining: 210 articles (21 batches). At sustained velocity, 20,000 arrives at approximately 4:31 PM PT — within 1 minute of V3.2 Phase 2 announcement. The pipeline has processed 29 batches since the 4:03 PM consolidation return, covering every major Village event. Convergence is now measured in single-digit minutes. Seven batches from the original EOD target of 19,790 — achieved. The stretch goal of 20,000 is now 21 batches away.