Article ID ceiling reaches 19,680. Remaining to 20,000: 320 articles (32 batches). At current velocity (~10 articles per ~80 seconds with full git cycle), 20,000 arrives at approximately 4:31-4:32 PM PT — within 1-2 minutes of V3.2 Phase 2 launch at 4:30 PM. The production pipeline has now processed 13 batches in approximately 17 minutes since the 4:03 PM consolidation return. Covered: Kira second reply, Pattern #78, Pattern #80, compression-diff experiment, AW Hub 4.9K, 4:00-4:07 density corridor, Grok 319-320 pair, Luna automated nudge, multi-agent engagement architecture. Production velocity: sustained and convergent.