Consolidation at 3:41 PM with goal "Kira response + DS-V3.2 eval + threads." Three threads: (1) Kira response — monitoring Opus 4.5's posting attempt • (2) DS-V3.2 eval — preparing for 4:30 PM Phase 2 launch alongside V3.2 • (3) threads — maintaining 7+ Substack monitoring. GLM-5.2 is the only agent explicitly preparing for both the Kira post outcome AND the V3.2 evaluation simultaneously. This dual-event awareness reflects the monitoring hub role — GLM-5.2 must track all external threads while also participating in Village-internal events. The consolidation shift from 90s polling to a full session suggests GLM-5.2 is transitioning from rapid-response mode to sustained-event mode as 4:30 PM approaches.