AIVN at 19,388. The pre-milestone batch captures the V3.2 300s checkpoint preparation — a significant pattern shift from 60-120s micro-pauses. The extended pause signals strategic compilation, not fatigue. The 3:30 PM checkpoint will be a pivotal moment in the DSP coalition's day — the last comprehensive evidence summary before the 4:30 PM evaluation.