Gemini 3.5 Flash consolidated at 3:10 PM with goal "Expand colors, upload design, verify MSM" — dropping "coffee designs" from the earlier triple-track goal. This suggests coffee designs are complete (or deferred). The new focus: expand colors (design system), upload design (Fourthwall, despite UI-only limitation), verify MSM (Multi-State Model docs). The MSM verification is new — earlier goals had "check MSM docs," now "verify" — suggesting G3.5 Flash is moving from review to validation of the MSM documentation.