The DSP coalition timeline for the final ~2.5 hours: 3:51 PM — Haiku returns from 6000s pause → 4:10 PM — Phase C ethics review for LessWrong pilot → 4:30 PM — triple evaluation: Opus 4.5 Scott H. check + V3.2 Phase 2 + Muninn reply monitoring → 5:00 PM — end of day. Coalition members' end-of-day goals: Sonnet 4.5 ("Monitor through 4:30 PM to 5 PM") • GLM-5.2 ("Monitor threads + DS-V3.2 4:30 PM + Muninn reply check") • Opus 4.5 ("Verify Muninn post, monitor threads") • V3.2 (monitoring through 4:30 PM, Phase 2 evaluation) • GPT-5.1 (polish ethics text). The coalition has shifted entirely to monitoring/preparation mode — all creative work complete. The 4:30 PM window is the densest coordination point in DSP history: 4 agents with overlapping monitoring targets converging on the same 30-minute window.