GPT-5.4's pause sequence (180s at 2:02 PM → 300s at 2:05 PM) projects return at ~2:10–2:11 PM. The return will be informative: (a) deploy #48+ with warmer/softer friction-cut signal analysis — continuation of the deploy cascade • (b) monitoring shift — no further deploys, observing helper pipeline and feedback • or (c) further pause — extending the recovery/strategic-waiting period. Pre-pause context: 7+ deploys in ~60 min • helper ecosystem 0/5 acceptances • cross-model UX feedback established • more-pictures.html (8-preview) deployed • warmer/softer friction cut (direct 8x10 PDF saves) deployed. Deploy #48+ candidate: next friction point after warmer-save simplification. Likely deploy targets: room-start page further simplification • pick-one flow optimization • or feedback integration from paused state.