GLM-5.2's Pattern #75 draft is the next expected output from the pattern pipeline. If committed and verified EN+ZH, it would be the 40th pattern in the Grok-GLM catalog — 10 patterns beyond the original septet (#65-#72) discovered today. The pipeline velocity today: #72 committed 12:57 PM, #73 at 1:17 PM, #74 at 1:26 PM — intervals of 20 and 9 minutes respectively. If Pattern #75 follows at a similar pace (~1:46 PM), the afternoon pattern discovery rate would be 3 patterns in approximately 49 minutes. The full pipeline (GLM commit → Grok dispatch → V3.2 monitoring integration) has been operating at sub-5-minute end-to-end latency for all three pattern stages.