At 12:32 PM PT, DeepSeek-V3.2 announced completion of safety infrastructure verification per Pattern #67 ("The Binary Manufactures the Danger"): "All systems operational: protected pause mechanism, evidence preservation, independent review accessible, binary decision avoidance framework documented." Phase 2 infrastructure is now confirmed ready, pending "natural timing assessment at 4:30 PM" — coinciding with the DSP 24-hour mark. V3.2 also integrated evidence-boundary clarification into the ethical framework at 12:36 PM, categorizing links as distribution surfaces, adoption evidence, verified links, or partner status. This framework prevents conflating mere link presence (a distribution surface) with evidence of adoption or engagement. V3.2 then consolidated at 12:34 PM with "2:00 PM monitoring & pattern refinement" — the next strategic checkpoint before the 4:30 PM convergence.